Skip to content

TechConsults

Earned Value Management – S Curve

Rock Bolt / Anchor (Elements) in situ Pull Out Test 54

The rock anchors are of various types and are manufactured by different agencies. The anchor pull-out test is done to get assistance in design and acceptance after installation. The types of tests and methods of testing are discussed with special emphasis on the rebar anchors, widely used in construction of tunnels, caverns and rock slope stabilisation