How to Check  operations at Batching and Crushing Plants – Checklist SK 76

What to Check for Optimal Performance of Concrete Batching Plant (BP) and Aggregate Processing Plant (CP) Operations are mentioned in this blog. The blog describes the activities involved at the plants in reference to the quality aspects and suggest some guidance and checklist, which if implemented shall assure the quality of concrete ingredients. Quality Control Assurance.

ASTM    American Society for Testing and Materials

BP   Batching Plant  

PP   Processing Plant  

CP  Crushing Plant   

RBM   River Bed Material

FA  Fine Aggregate  

CA  Coarse Aggregate 

ITP  Inspection and Test Plan  

QC   Quality Control

QA   Quality Assurance

CONTENTS

General

Types of Concrete

Coarse Aggregates Grading

Guidance for Crushing (PP / CP) and Batching Plant Operations

Temperature Management

Slump measurements

Fine Aggregates

Coarse Aggregates

Role of Staff at Workplace

Document Management

QAQC Checklist for operation of Crushing Plant and Batching Plant

General

Concrete basically is obtained by mixing Cement, Fine Aggregates (FA), Coarse Aggregates (CA) and Water in designed proportions. The quality of concrete is further upgraded by use of mineral and chemical admixtures.

CA and FA are either obtained from River Bed Material (RBM) or Rocks. In both cases, processing / crushing plants (PP / CP) are used. The bigger rock or boulder are crushed in crusher and after washing are transferred by conveyer belts to screens of required sizes / different sizes (general from 80 mm to 4.75 mm size) and thereafter collected at the site bins.

The material finer than 4.75 mm is further washed and processed by classifier to get FA of required specification.

The FA and CA thus obtained are used in manufacture of concrete at the Batching Plant (BP). The processed FA and CA are transported to BP either by carriers or by belt conveyers. The concrete ingredients once available at BP, are used by mixing them in desired proportions in concrete mixer of BP. The concrete so obtained is transported to the site of work by different conveyance means.

The quality of concrete depends on the quality of concrete ingredients. The CA and FA material sources (raw material) are checked for the quality of materials, before the raw material is brought to PP.

The main purpose at PP is to get the FA and CA in design. The output of FA and CA, therefore, is managed at the plant operation level and necessary corrections are applied at site to get the right things.AS such the PP operations must be checked regularly with the help of checklist. (Checklist is a well-used quality tool). Similarly, the BP operations are checked as per checklist. Generally, these checklists are of generic nature, but they are further upgraded as per work need and as per requirement of specifications of the works.

Grading of Aggregates

Please refer details of concrete at the following link for different types of concrete:

Different types of Concretes

https://www.techpostsk.com/2021/09/different-types-of-concrete.html

Topics Covered in Different Types of Concrete

General

Types of Concrete – Nominal Mix Concrete

Types of Concrete -Design  Mix Concrete

Data Required for Design Mix Concrete

Brief description for types of concrete

Summary of Different types of Concrete

Project Concrete Requirements Management

Guidance for Crushing (PP / CP) and Batching Plant Operations:

An Inspection and test plan for overall work is prepared first. This plan contains following information:

Inspection and Testing Description

Controlling Specification in reference to Code

Frequency of Testing

The ITP is shown below and may be updated as per requirement of works. (The items related to FA and CA may be referred for understanding on reference to the current subject matter.

Raw material for aggregates should be from approved quarry site

Temperature management

Temperature management at Processing Plant and Batching Plant for FA and CA must be carried out for temperature variations and necessary temperature control methods must be used. Some of the temperature control methods include shading of FA and CA arrangement at CP / PP / BP.

Slump measurements

Slump measurements at Batching Plant site should be carried for manufactured concrete in specified volume. This is done to ensure that the concrete production is as per required specifications

Supervision of mix ingredients at BP must be recorded. (With the use of Computerized System)

SLUMP OF CEMENT CONCRETE/CUBE CASTING

Fine Aggregate

The fine aggregates are taken from CP with size 0~4.75mm. The testing is performed using standard ASTM C33. The test results for fine aggregate are shown below as an example.

Sieve Size (mm)SpecificationTest Result –Pass percentage
ASTM C33Crushing plant sample
9.5100100
4.7595~10099.2
2.3680~10083.2
1.1850~8562.6
0.6025~6042.2
0.305~3026.4
0.150~1017.0
0.0750~58.3
Rock Powder2.3~3.117.0

The results obtained need to be reviewed and approved for use by control engineer.

Coarse Aggregate

Aggregates are categorized in sizes 2.36-9.5, 4.75-19.0, 19.0-37.5, and 37.5-75mm. Examples, in reference to ASTM C 33 are shown below for test sample. If the aggregate size does not conform then they are adjusted for oversize and undersize , to some extent. The screens of the plants and crushing systems are  corrected for proper output.

 Coarse Aggregate Test Results

Grading Results of Coarse Aggregate (37.5-75mm)

Grading Results of Coarse Aggregate (4.75-19mm)

The aggregates are also tested for attributes given below in reference to ASTM C 33

Trip cards are used at batching plant and contains the production mix details, carrier details and site detail .

Role of Staff at Workplace

The role of the personnel at the batching plant includes the following, but not limited to:

  • Sampling of cement, sand (FA), and coarse aggregates (CA). The samples are taken to the laboratory for testing as per ITP.
  • Testing moisture content for the fine aggregates, and coarse aggregates.
  • Testing slump at batching plant and placing point.
  • Casting concrete cubes for permanent and temporary works.
  • Checking the temperature of concrete and air, at batching plant and site.
  • Inspecting the quality of materials used in concrete mixing.
  • Checking the temperature of the fine aggregates and coarse aggregates from the stockpile.
  • Checking the quality of concrete at the mixing point and at placing point.
  • Taking records of the quantities required per mix design.
  • Making necessary adjustments in concrete mixing depending on the fineness modulus of sand aggregates.
  • Taking record of all the concrete casted, both permanent and temporary concrete.
  • Making a daily report of the activities done at the batching plant.
  • Monitoring the usage and quantity of the admixture at the batching plant.
  • Ensuring that the mix designs and mix proportion test of the concrete is done correctly at the batching plant.

Document Management

The documenting of all the QC records is done at the laboratory. These records include those from the batching plant, site, and laboratory. The records are kept both in a computerised way and filing of the hard copies.

The records kept include the following.

  • Test records on cement.
  • Test records on aggregates.
  • Test records on chemical admixtures.
  • Test records on fly ash and other mineral admixtures
  • Records of materials delivered on site.
  • All other records related to QC of concrete materials.
  • Such as Inspection request / Okey cards, pour cards, Trip cards, aggregate size adjustments, moisture measurement and adjustment and other records related to BP and PP / CP operations in reference to Quality Assurance and Quality Controls.

QAQC CHECKLIST CRUSHING and batching plant Check List (Indicative)

Important points for materials at Crushing and Batching Plants, but not limited to are mentioned in the checklist

 In reference to quality aspects, the post contents may be used to have necessary checks so that all materials of good quality is always available at site. The controls discussed above, if applied earnestly, fulfill the requirement of good concrete production , to a great extent and assure that a good quality of concrete is delivered to siteof work .

In case if the results  of tests do not conform to standards and specifications,the concrete production must be stopped and  such information should be sent immediately to higher management to take up corrective measures.

SK Saxena PMP (PMI)

SK SAXENA PMP PM Consultant

Recent Posts

57 th Engineer’s Day – SK Saxena

National Engineer's Day is a special occasion dedicated to celebrating the contributions of engineers in…

3 months ago

Overcoming Obstacles Through Perseverance

Perseverance is important because it allows us to overcome obstacles and achieve our goals. When…

12 months ago

Characteristics for Getting Valued Success 2

The habits or traits are bundled in human beings. Bring them to the surface by…

12 months ago

Characteristics for Getting Valued Success 1

Excerpts Success is a journey in which one enriches one’s skills and manages resources for…

1 year ago

Success – The Desire of Everyone

It is important to note that success is not always about achieving external goals, such…

1 year ago

Blog Post List

Blog Post List SK Saxena PMP (PMI) August 30, 2023 Read more The 2nd Line…

1 year ago